The front façade of a brick building undergoing a gut renovation at 492 Warren Street in Boerum Hill partially collapsed during Saturday's blizzard.
The New York City Buildings Department's web site indicates that a Stop Work Order was issued because the NYC Fire Department requested a "structural stability inspection due to front wall collapse and rear wall in danger of collapsing."
A permit was approved by DoB in September 2015 to turn the existing four family building into a two-family residence. The construction work also included a vertical and horizontal addition.
The construction project apparently has had a fair number of problems. More than 20 complaints have been called in to DoB regarding this address. The complaints include work despite a stop-work-order, appearance of exterior cracks, and demolition without proper safety measures.
The photos above were taken on Monday morning. Workers were in the process of stabilizing the remaing façade with 2x4s.
Read more
The New York City Buildings Department's web site indicates that a Stop Work Order was issued because the NYC Fire Department requested a "structural stability inspection due to front wall collapse and rear wall in danger of collapsing."
A permit was approved by DoB in September 2015 to turn the existing four family building into a two-family residence. The construction work also included a vertical and horizontal addition.
The construction project apparently has had a fair number of problems. More than 20 complaints have been called in to DoB regarding this address. The complaints include work despite a stop-work-order, appearance of exterior cracks, and demolition without proper safety measures.
The photos above were taken on Monday morning. Workers were in the process of stabilizing the remaing façade with 2x4s.
Read more






