Showing posts with label Amanda Burden. Show all posts
Showing posts with label Amanda Burden. Show all posts

Wednesday, October 30, 2013

No Gowanus Planning Without Meaningful Representation: Let's Demand A Truly Democratic Process

IMG_6015
IMG_8530
IMG_4030
From 2008's City Planning Gowanus Draft Rezoning Proposal
Pratt Center's Draft Timeline For "Gowanus Community Planning"

Proposed Gowanus Zoning study area


No Gowanus Planning Without Meaningful Representation:
A rather long post about a terribly important issue

With the Brooklyn real estate market soaring in the last decade, developers have been salivating over the mostly-industrial Gowanus Canal area.  However, their dreams of luxury glass-clad high-rises clashes with the popular vision of Gowanus as an incubator for small businesses, light manufacturing and the arts.
Local residents have been debating the merits of one over the other with much fervor. The conversation became more divisive when, in November 2008, New York City Department of Planning Commissioner Amanda Burden came to the community to introduce her agency's Draft Rezoning Proposal for 25 blocks along the Gowanus Canal. The land use framework put forth by City Planning addressed issues like land use, density, bulk and waterfront access.
Though the rezoning proposal sought to maintain areas for continued industrial and commercial use,
it also allowing for a mix of uses, including residential, in certain areas currently zoned for manufacturing.  According to the timeline presented by City Planning at the time, the Uniform Land Use Review Process (ULURP), the public review process of a rezoning, was due to begin in early 2009.

What City Planning was envisioning for those mixed-use areas would soon become clear.  In February 2009, after a contentious ULURP process and much community opposition, City Planning granted Toll Brothers, a national developer, a rezoning from manufacturing to mixed use, allowing Toll to build 470 residential condo units at the edge of the canal.
At the time, City Planning justified their decision to allow Toll Brothers to move ahead of the City's over-all rezoning by saying that the project was essentially based on their own plans for Gowanus.

But just two months later, in April 2009,  the Environmental Protection Agency (EPA) proposed the 1.8 mile long Gowanus Canal to the Agency’s Superfund National Priorities List, a list reserved for the country's most polluted sites.  Toll Brothers bailed on their project, and City Planning shelved their rezoning.

By the following year, the EPA had formally designated the Gowanus a Superfund site.  The agency made it clear that they would not get involved in land-use issues, but suggested that it would be helpful to the agency to know the end use of the uplands.

Then in 2011, Hurricane Sandy slammed into the area, and caused serious flooding to homes and businesses in Gowanus.  City Planning made clear that the agency had no plans to resume its rezoning effort until Federal Emergency Management Agency (FEMA) had released its redrawn post-Sandy draft flood maps.

After the hurricane, many of our local elected officials addressed this 'new reality.' Congresswoman Velázquez spoke of the need to set public policy and of a revision of the type of development allowed along the coastline. Councilman Brad Lander felt that this was a very important time, one which offered a re-set button in regards to development on the shores of the Gowanus Canal.

The Superfund nomination of the canal and the hurricane only offered a short reprieve from a rezoning. By this spring, Councilman Lander was ready to resume the conversation about 'planning for Gowanus'. However, at several meetings, he hinted that a rezoning should be moved forward under a new administration,  and that "the upcoming transition at City Hall – with a new Mayor and City Planning Commission – presents an opportunity for a better outcome."

On August 5, 2013, State Senator Velmanette Montgomery, Congresswoman Nydia Velazquez, State Assemblywoman Joan Millman,  Councilmember Steven Levin and Councilmember Lander convened  a Gowanus Planning Kick-Off meeting. On the list of invited stakeholders were representatives from local organizations and neighborhood associations.***
This first step in what Councilman Brad Lander called "inclusive community planning" didn't seem so inclusive to some.  The meeting was not announced, not posted in any way on the internet,  not open to the general public and was closed to the press.

Pratt Center for Community Development (not to be confused with the Pratt Institute) has been hired by the elected officials as the consultant that is running the planning process.
According to an overview  prepared by Pratt, the goal of these planning meetings is to:
*Develop the outlines of a comprehensive, community‐based infrastructure and land‐use plan for a safe, vibrant, and sustainable Gowanus area
*Bring community stakeholders together to build as much consensus as we can around a long‐term vision for the Gowanus Canal area
*Shape the next NYC mayoral administration’s thinking about the Gowanus Canal
*Create a space for honest conversation about different viewpoints

Just recently, Pratt has held a series of small group interviews with the stakeholders who were invited to the first meeting.  I was asked to participate in the group that apparently "cared deeply about the environment."  The interview, held on Monday evening, was led by Elena Conte and Paula Crespo of Pratt.  The questions were rather basic and covered such topics as what makes Gowanus special, what should be preserved, and what are some of the infrastructure issues.  

My group included members from CORDSave Gowanus, and South Brooklyn Local Development.
(FROGG, though invited, did not send a representative because the group put into question the validity of the process.)
The group quickly seemed to reach consensus that before moving ahead with any re-zoning, a health study and a hydrological study were needed to investigate the health effects of exposure to the environmental hazards in Gowanus, and to evaluate the effect of new development in this flood prone area. We also felt that we first need assurances that the City Of New York will pay and follow through  on the EPA-mandated retention basins that will help reduce the Combined Sewer Overflows and improve water quality in the canal.  Without these studies and without the retention basins, planning more housing in Gowanus seemed "recklessly premature."

In the coming weeks, Pratt Center will compile the information from these interviews and will then host a series of three public meetings.  The first one is scheduled for Thursday, November 14th.  (The time and place has not yet been determined.  As soon as I find out, I will post the information.)

Personally, I remain very skeptical of this entire 'Gowanus planning' process and doubt that the community will have a true say or vote in the outcome.  Though I appreciate the opportunity to weigh in on the area's future,  I can't shake the suspicion that my participation in these meetings only serves to rubber-stamp a re-zoning plan that has already been chosen by our politicians and by developers.

As far as Brad's suggestion that planning under a new city administration presents the opportunity for a better outcome, he may be mistaken.
As the latest numbers indicate, Bill deBlasio will most likely be our next mayor.  DeBlasio not only supported the Toll Brothers spot-rezoning back in '08, he fought hard to drive away the EPA when the agency proposed to list the Gowanus as a Superfund.
If DeBlasio wins , we can be sure that he will hand over the Gowanus Canal to developers on a silver platter, no matter what we say.
"I give Mayor Bloomberg tremendous credit for fighting [the EPA] tooth and nail, and I was proud to stand with him. We tried every play in the book to save the [Toll Brothers'] development deal.
In the end, the EPA won out, the development stalled and every time I drive past that site I see derelict lots where we should now have hundreds of new homes and jobs.


I couldn't disagree more. Today, the Gowanus Canal area is slowly healing after years of neglect. Small businesses and a vibrant artist community are thriving there.  Jobs are being created.  Yes, the area has some serious environmental problems, but thanks to the EPA, they are being addressed.  What seems to be holding back Gowanus is the threat of a zoning change that will most likely drive away many businesses, and the speculation by developers that a re-zoning will reward them for holding on to their 'derelict lots'.

We owe it to ourselves and to all who will come after us to take our seat at the table, and to push for a true, transparent, democratic process.  We need to tell our politicians that before any new development is envisioned, we need to first find out what the Gowanus can sustain.  We need to first invest in infrastructure to strengthen the businesses and the residential areas that are already there, and we need to demand new tools in City Planning's tool box.  Because Gowanus is unique and deserves solutions that are just as unique.

***I was invited to the August meeting but was out of the country and could not attend.


IMG_7065


Read more

Monday, March 18, 2013

Lightstone Group's Plans And Drawings For Gowanus Project Approved By City Planning, But Developer Still Needs Waterfront Certificate

IMG_1983
NYC Department Of City Planning Hearing for Lightstone Group's Gowanus development  
IMG_1981
Commissioner Betty Chen, Commissioner Michelle De La Uz, and Amanda Burden,  Chair of the NYC Department Of City Planning
IMG_1984
Commissioner Michelle De La Uz and City Planning Chair Amanda Burden
(De La Uz is the executive director of the 5th Ave. Committee. During the Lightstone discussion, she recused herself, since the developer has contracted with the 5th Avenue Committee to manage the affordable units included in the project.)
IMG_1987
 Amanda Burden,  Chair of the City Planning Commission
IMG_1988
Purnima Kapur, City Planning Brooklyn Director
IMG_1991
Aline Fader, representing NYC DCP Brooklyn Office, presents Lightstone's newest plan
IMG_1990
Aline Fader and colleague present Lightstone Groups's as-of-right project

Just a few days ago, it was announced that Lightstone Group is proceeding with its 500,000 square feet mixed-use housing development on the shores of the Gowanus Canal at 363-365 Bond Street as an as-of-right development and has abandoned the minor modification which it had previously requested of NYC's Department of City Planning (DCP).

During DCP's review session on Monday afternoon, representatives of the Brooklyn DCP office explained that Lightstone, apparently wanting to avoid the risk of legal action,  has withdrawn its minor modification application and has decided to pursue the as-of-right development under zoning granted in 2009.
This project had come in front of the commission once before in September 2012 as a 'minor modification' of the original 2009 special permit project previously granted to Toll Brothers.

This as-of-right development is nevertheless subject to City Planning Commission approval because the 2009 special permit project was made subject to a restrictive declaration that was attached to the plans and drawings.

One of the purposes of the restrictive process was to help insure that the key urban design principals of the special permit project, which ensures that the taller portions of the development should be on the canal side and the lower portions should be along Bond Street, would be respected.

The second restriction has to do with Waterfront Zoning Regulations, which did not apply to the Gowanus Canal at the time of the original approval in early 2009.  However, later the same year, the City Council made the canal subject to the zoning regulations and water front open space will now be required in connection with the as-of-right project under those provisions.

The original 2009 project provide public open space along the canal that was designed "in the spirit of" the Waterfront Regulations. It did not strictly adhere to them.  Lightstone has modified the drawings to allow the requited waterfront public access area to be included, resulting "in a net increase of open space on the Southern block, where the building is being pushed back by approximately 20 feet."

To address FEMA's recently released Advisory Base Flood Elevations and  changes to the Building Code,  the site will be raised by 2 feet at First Street. Lightstone will elevate the ground floor of the building approximately 1.1 foot and make the street level parking garage a "bath tub structure".

At yesterday's DCP session, Lightstone sought approval for the plans and drawings for the as-of right project.
The Planning Commission votes unanimously to grant the approval.

However, at a later date, the applicant will need to seek a Waterfront Certificate from Chair Amanda Burden in regards to the design of the waterfront open space. The certificate will specify the design of the open space and certify that it meets the zoning requirements. The applicant is expected to file the application later this year.

"And at that point, and only at that point, will the developer be able to begin construction. So it's really a two-step process" a representative of the Brooklyn DCP office was quick to point out during the presentation.




Read more

Sunday, March 17, 2013

Important Update And Meeting Regarding Lightstone's Proposed Gowanus Project

IMG_8977
IMG_8996
Old rendering of Lightstone Development next to the Gowanus Canal (credit: Lightstone Group)
Lightstone new rendering
New Rendering Of Lightstone Development
(Via Councilman Lander's office)
Screen Shot 2013-03-17 at 1.29.30 PM
New elevation drawings for Lightstone Project. Click here for enlarged view
(Via Councilman Lander's office)
Screen Shot 2013-03-07 at 5.13.14 PM
Untitled
Lightstone Development site, Canal at Carroll Street during Sandy (photo credit: Margaret Maugenest)
Second Street at canal during storm (photo credit: Triada Samaras)
Sandy flooding at First Street near Canal (photo credit: Carl Teitelbaum)

***Important Information For All Carroll Gardens/Gowanus Residents***

Tomorrow, Monday March 18
at 1 pm
Spector Hall, 22 Reade Street, New York, New York

There is some very important information that was circulated late last week on Lightstone Group's proposed large-scale Gowanus development at 363-365 Bond Street, between Carroll Street and 2nd Street.
According to Councilman Brad Lander's office, which informed several Gowanus residents on Thursday evening, Lightstone is proceeding with the project "as of right" and has abandoned the minor modification which they had previously requested of NYC's Department of City Planning (DCP).

In 2012, hoping to piggy-back on the former Toll Brothers project at the same site, Lightstone had sought DCP's approval for variations in the base height of the project, building heights and footprints of portions of the buildings, relocation of parking entrances, changes to the location and design of the open space, and changes to the number of residential units from 447 to 700.  DCP considered these changes "minor" modification's, which are subject to review and approval only by the Commission, rather than 'major' modifications that require the initiation of a new ULURP.

DCP was going to rule on this matter in November 2012, but the hearing never took place because of Hurricane Sandy. The community was told that DCP and its Brooklyn office were first waiting for the release of Federal Emergency Management Agency's new post-Sandy "Advisory Base Flood Elevations (ABFE)", which indicate significant expansion of the flood plains.
The ABFEs for the Gowanus area were published very recently.

Perhaps concerned about new flood regulations in Zone A and of legal challenges, Lightstone has re-configured the proposed 700-unit development so that it can move forward according to the site's existing zoning. To address the fact that the land sits squarely in FEMA's flood zone A and to comply with new waterfront development rules, Lightstone has pulled away slightly from the water and increased the grade at First Street.

City Planning has placed the Lightstone item back on its calendar for tomorrow, Monday March 18, at 1 pm, Spector Hall, 22 Reade Street, New York, New York. (It's the 9th agenda item).  The meeting is open, but no comments will be accepted from the public.
All important information can be found here: http://www.nyc.gov/html/dcp/pdf/luproc/reviewsession.pdf?r=031813

I urge everyone to attend. This project will most likely serve as the blueprint for the over-all rezoning for the Gowanus Canal and will create repercussions for neighboring residents.  The plan to raise the entire site will most likely increase flooding in nearby properties.  

Councilman Brad Lander, who has previously asked Lightstone to withdraw its application, issued the following comment on Friday:  “In the wake of Hurricane Sandy, I continue to believe it is a mistake to move forward with dense, high-rise, residential development without a comprehensive plan for infrastructure and land use regulations that Gowanus needs.” 



Read more

Tuesday, November 27, 2012

In Regards To Lightstone Group's 'Minor Modifications' For Gowanus Project, Brooklyn Law School Clinic Finds Department Of City Planning In Violation Of Article 78.

IMG_2256
363-365 Bond Street
Image of proposed development courtesy of The Lightstone Group
To read the letter in its entirety, click here

Brooklyn Law School Community Development Clinic  recently sent a letter to Amanda Burden, Chairperson of New York City's Department Of City Planning (DCP) on behalf of Friends And Residents of Greater Gowanus (FROGG) urging her agency to take no further action on the Lightstone Group's application for a modification to its previously approved special permit related to a proposed large- scale general development project at 363-365 Bond Street in Gowanus, Brooklyn.

Hoping to piggy-back on the former Toll Brothers project, which called for 447 condo units on the shores of the Gowanus Canal, Lightstone is seeking DCP's approval for variations in the base height of the project, building heights and footprints of portions of the buildings, relocation of parking entrances, changes to the location and design of the open space, and changes to the number of residential units from 447 to 700.
DCP considers these changes "minor" modification's which are subject to review and approval only by the Commission, rather than 'major' modifications, which would require the initiation of a new ULURP.

After researching the legality of this matter, Brooklyn Law School Community Development Clinic concluded that :

*DCP’s consideration and administrative approval of “minor modification” applications outside the Uniform Land Use Review Procedure1 (“ULURP”) is ultra vires and therefore null and void.

*DCP’s determination does not carry the force of law because the rule that DCP applies to evaluate proposed modifications was not adopted pursuant to the strict requirements of the City Administrative Procedure Act2 (“CAPA”). 
*DCP's failure to account for the proposed increase in floor area, a mandatory consideration under DCP's impermissible rule, "was arbitrary and capricious and in violation of applicable law. " N.Y.C.P.L.R. 7803 (3).

The findings confirm what many Gowanus area residents have been suspecting for a long time: that the DCP 'minor modification' process was flawed from the beginning and that it allowed the developer to circumvent the usual ULURP process.

Ironically, Brooklyn Law School Community Development Clinic's letter was delivered to Amanda Burden in time to be considered for DCP's deliberations on the Lightstone matter that were scheduled for Monday Oct 29th, 2012, the day Hurricane Sandy flooded the city and this proposed development site with a 14 foot storm surge. The meeting has yet to be rescheduled.

You can read the Brooklyn Law School letter in its entirety after the jump by clicking here

Read more

Monday, November 12, 2012

Friends And Residents Of Greater Gowanus (FROGG) To City Planning: After Sandy, How Can Department Consider 700-Unit Apartment Complex In Gowanus?

IMG_8977
IMG_8996
Proposed Lightstone Development next to the Gowanus Canal (credit: Lightstone Group)
IMG_9006
IMG_9002
IMG_9000
Untitled
Lightstone Development site, Canal at Carroll Street during Sandy  (photo credit: Margaret Maugenest)
Second and Bond Streets during storm (photo credit: Triada Samaras)
Sandy flooding at First and Bond Streets near Canal (photo credit: Carl Teitelbaum)

On November 13th***, NYC's Department Of City Planning will be reviewing The Lightstone Group's application for "minor modifications" to the previously approved land use actions at 363-365 Bond Street on two blocks right next to the Gowanus Canal. One of those minor modifications is to increase the number of units from 447 to 700, which doesn't seem so very minor at all.

In 2009, after a Uniform Land Use Review Process (ULURP) that was set in motion by Toll Brothers, a national development company, the property was spot re-zoned by City Planning from manufacturing to special mixed-use, which allows housing.
After the Gowanus Canal was declared a Superfund Site by the US Environmental Protection Agency in 2010, Toll Brothers decided to abandon plans for their proposed condo development.

Lightstone revived the project and is planning a 700-unit rental complex. In order to proceed, they just need City Planning's approval.  (It is important to note that Lightstone could start construction on the previously approved 447 unit building immediately.)

Many Gowanus residents have warned that the building site is in a flood zone A and that the infrastructure, especially the sewer system in the Gowanus area is dreadfully antiquated.  
After Hurricane Sandy and the ensuing flooding, these concerns are well founded.

The group Friends And Residents Of Greater Gowanus (FROGG) just released the  statement below aimed at NYC Planning and Chairperson Amanda Burden to address the 'new reality' about the vulnerability of our shoreline and the risks of bringing more residents to a flood plain.

BROOKLYN RESIDENTS, SMALL BUSINESSES BLAST NY CITY PLANNING’S DECISION TO CONSIDER A NEW 700-UNIT APARTMENT COMPLEX IN CONTAMINATED ZONE A
Development would be the first approved since Superstorm Sandy despite being in a flood-prone, mandatory evacuation zone along a hazardous Superfund site; Brooklyners upset at the prospective rise in insurance costs from the eventual bail out of this building in the next storm; City Planning to discuss approval November 13.***
Brooklyn residents and small businesses are outraged that the New York City Planning Commission will consider a proposal to build a gigantic 8 to 12 story apartment complex to house over 1400 residents on the banks of the Gowanus Canal, which is a hazardous federal Superfund site. Their proposed site was under more than 10 feet of toxic, sewage- contaminated water during Hurricane Sandy.
After the mandatory evacuation order for Zone A and the continuing devastation from the hurricane, many Gowanus residents have still not been allowed to return to their damaged buildings. Other high rises in the neighborhood, such as the Gowanus Houses, are still without power and heat a week after the storm. The EPA is currently conducting street-level site sampling to determie whether the cancer-causing contaminants from the canal’s toxic sediments linger and are harmful to citizens. It’s in this dystopian environment that the Lightstone Group is applying
to build an apartment complex. “It is lunacy for the city to consider this project in light of the damage from the hurricane,” says Linda Mariano, co-chair of the community advisory group Friends and Residents of the Greater Gowanus (FROGG). “We are calling for a full moratorium on development and all up-scale zoning changes in any waterfront district.”
A 2010 State Sea-Level Task Force Report recommends " restriction of new development and redevelopment in high- risk areas”. That’s because the costs of dealing with a storm’s aftermath is too costly to New York taxpayers. The dollars to bail out residents during future storm surges raises everyone’s taxes as well as insurance rates.
The NY City Planning Commission will discuss this project at a November 13 meeting at which the public is not allowed to speak. Unlike other proposals for new developments, the Lightstone project is slipping backdoor through a loophole in the city planning process. The proposal will not go through a city ULURP hearing or have to file and environmental impact statement because of
an earlier area spot zoning in 2009. However, given the federal government’s designation of the Gowanus Canal as a Superfund site in 2010 and the incredible damage and displacement
from Hurricane Sandy, it is irresponsible for the City Planning Commission to greenlight such a development at this time.
Lightstone has said that despite the storm, it will proceed with building, claiming that they plan to raise the grade of their development to offer protection to the new residents. However, the surge brought in by Sandy exceeded their proposed elevation changes. And even if their buildings are above the flood plain,  all their of nearly 1400 residents will still need to be evacuated in the next storm– a task made more complicated by the city’s evacuation route also being underwater for high tides during the storm. Furthermore, in Sandy’s wake, new developments can’t only seek to impede a flood by trapping storm water, but also need to be evaluated as to whether they can assist in the speedy drainage of future storm surges, something Lightstone’s proposal does not include.
“Flood water would not only find another path, it would go further up each side of the Canal to find open or other accessible space,” says Diane Buxbaum, a neighborhood resident and environmentalist “It makes no sense to continue building on our shore areas. Creating open areas and trying to restore some link to wetlands is the better choice.”
More than 500 Brooklyn residents and small businesses have signed a petition decrying the development, and it is also opposed by a large number of community groups incluing FROGG (Friends and Residents of Greater Gowanus), CORD (Coalition for Responsible Development) and the Central Brooklyn Independent Democrats, among others.
These allies call upon Governor Cuomo, Mayor Bloomberg, Congresswoman Nydia Velasquez and Councilman Brad Lander and other elected officials, acting under the power of the current “State of Emergency,” to take the first steps in addressing the effects of hurricane and storm surge catastrophes by calling for a moratorium on development and all up-scale zoning changes in any waterfront district that was affected by the storm surge of hurricane Sandy. They call for Amanda Burden and the NY City Planning to put an immediate moratorium on the review or approval of any pending projects planned for Zone A, including that of the Lightstone Group, until new guidelines for such development have been created. To do otherwise would not only be foolish, but irresponsible and costly to the community as well. As Governor Andrew Cuomo recently stated, “We have a 100-year flood every two years now.” The NY City Department of Planning must acknowledge this fact, and act accordingly.
We must rebuild following Sandy – but not at the water’s edge. Let’s not create new and costly regional flood control problems.

*** The hearing on this development was delayed. The date apeared on NYC Department of City Planning's online calendar prior to Hurricane Sandy, but was removed after the storm. No word yet on when it will be rescheduled.




Read more

Monday, October 29, 2012

Hurricane Sandy, Flooding, Sandbagging And Evacuating In Gowanus

The Gowanus Canal yesterday afternoon, before the storm
photo credit Mary P.
Before the storm
Photo credit: Mary P.
The Gowanus Canal last night
Sandbags in front of The Satory on Bond Street

For the second year in a row,  New York City is feeling the effects of a hurricane and the flooding that accompanies these massive storms.  While Irene caused plenty of problems last August,  it would appear that Sandy will be  the "most catastrophic event in our lifetime."   Some predictions show that this particular storm will hammer the coast with 11 foot waves.  In our immediate area, Red Hook and Gowanus are particularly affected since they are located in Flood Zone A and experience flooding on a regular basis.
It is also for the second time in a bit more than a year that residents of these two neighborhoods have been  under mandatory evacuation orders.
In preparation for flooding, sandbagging in Gowanus began a few days ago.  The photos above were taken in front of The Satori on Bond Street and Union Street by my good friend Lisanne and posted on her blog Found In Brooklyn last night. This building as well as Third and Bond had to pump water out of their basement after Irene.

The photos below were taken this morning by friend Steve Miller. Steven remarks: "At 9:45 this morning we ate at the levels of last years Irene. The highest levels expected for Sandy at at approx 8pm tonight."
This will not be pretty, especially since, as we know,  the Gowanus Canal has been declared a Superfund Site because of the toxic sludge at the bottom of the canal.  The churning winds of a hurricane will most certainly stir up the thick black muck and deposit it on the shores.
In addition, the City Of New York still uses the Gowanus as a cess pool by allowing Combined Sewer Overflow to discharge into the waterway when its antiquated sewer system is overloaded (See video here). Can you imagine how much sewer will flow into the canal during this storm?

Gowanus at 9:30 Am this morning
photo credit: Steven M.
photo credit: Steven M.

Hurricane Sandy And Lightstone's Proposed Development On Bond Street
On a related note, it almost seems ironic now that NYC's Department of City Planning's calendar for today shows a hearing on The Lightstone Group's application for "minor modifications" to the previously approved land use actions at 363-365 Bond Street between Carroll Street and 2nd Street.
Lightstone's planned 700-unit rental building is right on the canal and in Zone A, which has just been evacuated for the second time in 14 months.
Perhaps DCP's Chairperson Amanda Burden should seriously think before rubber stamping this one.

IMG_8996
Lightstone Group's proposed 700-unit project along the Gowanus 
IMG_9002
IMG_9000

Here are some pictures taken of First and Bond Streets at 10 Am this morning, 2 hours after high tide.  This is exactly the spot of that beautiful Lightstone graphic above.
photo credit: Carl Teitelbaum

photo credit: Carl Teitelbaum

And here is one taken of the site as seen from the Carroll Street bridge at 10 Am today
Untitled
photo credit: Margaret Maugenest

And here are some photos taken by friend Triada Samaras of 2nd Street near the canal at about 5 PM.
I will continue to update this post and blog during the storm.  Please send me your photos and updates, but most importantly, stay safe.





Read more